Illinois Statewide Technical Reference Manual Version 15.0

Annual IL-TRM Update Process

IL-TRM Version 15.0 Errata Measures Memo

The following errata measures memo and worksheet were circulated to SAG on November 23, 2026:

Please notify the IL-TRM Administrator, VEIC, by Friday, December 4, 2026, of any questions or concerns related to these errata: [email protected]

Barring any objections or further corrections, the changes will be final on December 4. After that date VEIC recommends that the measure updates take effect on January 1, 2027 along with TRM Version 15.0.

IL-TRM Version 15.0 Final Deliverable (September 18, 2026)

IL-TRM Deliverable #3 – Almost Final (September 4, 2026)

Comments are due Friday, September 11

  • For each proposed edit, provide a Word Comment where you’ve made changes – this helps VEIC identify and compile all proposed changes to the draft.
  • Each organization should consolidate its members’ comments/redlines into one version, per draft volume.
  • All commented versions should be uploaded to the  Stakeholder Feedback folder.
  • If you need access to SharePoint, reach out to VEIC: [email protected]

IL-TRM Deliverable #2 (July 31, 2026)

Comments are due Friday, August 14

  • Please review material with a focus on content (rather than formatting) and propose edits.
  • For each edit, provide a Word Comment where you’ve made changes – this helps us efficiently identify and compile all proposed changes to the draft.
  • Each organization should consolidate its members’ comments/redlines into one version, per draft volume.
  • All commented versions should be uploaded to the Stakeholder Feedback folder on the IL-TRM SharePoint site.
  • If you need access to SharePoint, reach out to VEIC: [email protected]

IL-TRM Deliverable #1 (June 18, 2026)

Comments are due Friday, July 10

  • Please review material with a focus on content (rather than formatting) and propose edits.
  • For each edit, provide a Word Comment where you’ve made changes – this helps us efficiently identify and compile all proposed changes to the draft.
  • Each organization should consolidate its members’ comments/redlines into one version, per draft volume.
  • All commented versions should be uploaded to the Stakeholder Feedback folder on the IL-TRM SharePoint site.
  • If you need access to SharePoint, reach out to VEIC: [email protected]